Heavy Equipment Shipper hauls machine tools, presses, generators, tanks, conveyors, and whole production lines. If it needs to come off your plant floor and onto a truck, we can move it.
★ Insured carriers ★ Local and long-distance transport
★ Flatbed, step deck, RGN, and lowboy trailers
★ Plant, warehouse, dealer, and auction coordination
One machine or a full production line, with one coordinator from pickup through delivery.
Heavy Equipment Shipper moves presses, CNC machines, generators, tanks, conveyors, and other plant equipment across town or across the country. We work with plants, machine shops, dealers, manufacturers, and auction buyers, whether the job is one machine or an entire line.
Give us the equipment details, both addresses, and your target dates. We’ll line up the carrier and trailer, coordinate with both sites, handle permits when the load needs them, and keep you posted through delivery.
It all runs through the same nationwide network we use for heavy haul trucking, so you make a single call, and one person keeps the job moving.
Machine tools, production equipment, power gear, and the odd one-off nobody has a name for.
Weights are all over the map, and we’re prepared for anything. A mid-size machining center runs between 6,500 and 22,000 pounds, depending on the model. A 50-ton press brake runs 5,800 pounds in the short bed and 12,500 pounds in the long one. Smaller crated equipment may be better off as freight shipping, and we’ll say so if that fits your job.
Machinery we haul regularly:
We haven’t run into a machine yet that we couldn’t build a plan around. Air and gas compressors have their own spot on our compressor transport page, so start there if that’s what you’ve got.
The trailer’s the easy part. The real question is what lifts your machine at both ends.
Most machinery rides on a flatbed or step deck without much fuss. The weight is usually manageable, and the footprint is square. The bigger issue is pickup and drop: crane, forklift, or gantry, and whether the truck can get close enough.
Machine builders often spell out the lifting rules. Some recommend checking the shipping weight on the bill of lading before anyone lifts or handles the machine. Another recommends limiting hoisting to qualified people and calls for undamaged wire rope, shackles, and jigs rated for the full weight.
Tipping catches people off guard. Items like press brakes typically carry a factory warning that the machine is heavy in front and must be kept from tipping until the anchor bolts are secure. A machining center’s center of gravity may not sit where it looks, either. If the load is tall or the weight sits off-center, we’re talking oversize load shipping, and we plan the route around it.
How machinery usually ships:
Most machinery leaves the factory bolted to steel skids, and those skids are worth hanging onto. They give the forks and chains something to grab besides the machine itself.
Most of the work gets done before a truck ever pulls in.
Make, model, and shipping weight. If you still have the original paperwork, the weight is usually on the bill of lading from when the machine was delivered. Add the dimensions and a few photos.
This part sets the schedule. We need to know what’s available at each end to pick up the machine and set it down: your overhead crane, a forklift with enough capacity, or a crane brought in for the day. Ceiling height, door width, and floor loading matter too.
Leave the shipping skids and factory bracing on if the machine still has them. Loose tooling comes off or gets boxed, and anything that slides gets blocked. Drain fluids before pickup, not with a truck waiting on the dock.
Once the machine is on the deck, the carrier blocks and secures it based on its weight, shape, and how it sits on the skids. We work out the securement before pickup so the right equipment is on hand when the truck arrives.
Access and lifting can sometimes change the price more than mileage.
What affects the price:
The same machine is two different jobs depending on where it sits. One on the loading dock is simple. One bolted to the floor in a back corner takes more planning and lifting gear. We’d rather sort that out on the phone than find it when the truck arrives.
For a plant move, send us the full machine list, and we’ll set the load order. For dealer and auction buys, we need the release paperwork first. If you’re a manufacturer shipping to a customer, we’ll set the delivery window with the receiving site.
What gets you a real number:
A machine that arrives damaged doesn’t just cost money; it costs you production.
Most of what we haul can take a scratch. Your machine really can’t. A machining center holds tolerances measured in ten-thousandths, and a dropped press is an expensive paperweight.
Heavy Equipment Shipper has moved industrial and construction equipment for years. Machinery jobs are where we ask the most questions up front. That’s on purpose. Nobody wants a surprise at the dock while the line is down.
Why plants keep calling us:
“Great experience! Not only did they beat a competitor’s price (that had the order for a week and couldn’t get the job done), they had my Cat Dozer permitted + loaded within 48 hours! HIGHLY recommend these guys!” —Carlo S.
Factories, warehouses, auction houses, and job sites, coast to coast.
Plant closures, line expansions, industrial auctions, and machines headed to customers. We haul into and out of all of them. It all moves through the same heavy equipment transport network we use for our other freight.
Where we load machinery most often:
Tell us what’s on the floor and where it needs to go. What are we moving today?
Send the basic load details, and we’ll start putting the move together.
Heavy Equipment Shipper handles industrial machinery transport from pickup through delivery. Send us the make, model, weight, dimensions, both addresses, and a few photos. We’ll match the machine to the right trailer, plan the lift at each end, coordinate with both sites, and take care of any permits the route requires.
If you already have target dates, send them over. A little lead time gives us more room to line up the right carrier and keep the move on schedule.
It gets lifted. That’s the big difference between machinery and everything else we haul. The lift may use a forklift with enough capacity, your overhead crane, or a crane brought in for the day. Machine builders call for rated wire rope, shackles, and jigs sized for the full weight. That’s our standard too.
Check the bill of lading from when the machine was delivered. The shipping weight is usually printed on it. One machine builder tells owners to check that before anyone lifts or handles the machine. If the paperwork is gone, the make and model gets us close enough to plan.
Often, yes. It depends on the machine and the building. A straight lift with a rated forklift is one thing. Unstable, extra-heavy, or off-center loads may need a tandem lift or custom rigging. Tell us what you’re dealing with, and we’ll be straight about what it takes.
If the shipping skids are still there, leave them on. Machines leave the line bolted to steel skids, and builders say to keep the skids and bracing attached until the machine reaches its final spot. They give the forks and chains something to grab besides the machine casting.
Not the way most people think. The four-tiedown rule everyone quotes is for machines that run on wheels or tracks, so it doesn’t govern a press or machining center. Skids, blocking, and the machine’s shape all change how the carrier ties it down. Send photos, and we’ll sort it out before anything moves.
Usually a little. Loose tooling and fixtures come off or get boxed. Factory shipping blocks stay in, and anything that slides gets blocked. Drain fluids before pickup, not while the truck waits on your dock.
Not for us, but it changes the timeline. The anchor bolts have to come out, and the machine has to be free and secured against tipping before it lifts. A lot of this equipment carries its weight well forward. Build that into the schedule and pickup goes smoother.
Yes. We like those jobs. Send the full machine list with weights, and we’ll sequence the loads around your shutdown. One coordinator stays with the project, so you won’t have to explain it again to somebody new every week.
You’re covered, and we check the carrier’s cargo coverage before booking the load. The driver takes photos at loading and again at delivery. When a bumped casting means a real repair bill, that record matters.
#tab_answer